High-rise tower block in Baierbrunner Straße

2015

The ensemble around the Siemens high-rise building was originally planned and implemented by the architect Hans Maurer in the 1950s and is now to be converted into a new residential and work area following the conveyance of the site. The aim of our work was to work out a concept for the implementation of the intended residential usage into the existing tower block in such a way that the rules of the historic building fabric – both in the interior and in the external impression of the building – are respected and the building is reactivated as a vital component of the new residential area.

mehr
  • Location: Munich-Obersendling
  • Multiple commission: 2015, 1rst Prize
  • Project development: PBS Immobilien GmbH, Munich
  • Project execution: ISARIA Tower GmbH, Munich
  • Project team – current: Florian Hartmann, Andreas Müsseler, Oliver Noak, Lisa Yamaguchi, with Marcel Meili, Markus Peter, Annelie Asam, Dominik von Waldthausen, Mathias Adorf, Celia Fernández
mehr
Existing Floor
Black Plan
Model Photo Duplex Apartment
Site Plan
Model Photo Duplex Apartment
Axonometry static system
Model Photo Facade
Development System
Visualization Duplex Apartment
Visualization Floor Apartment
Visualization Floor Apartment
Floor Plan High Floor
Mezzanine floor plan
Apartment module
Views South and West
Facade section transformation